The Lab · Written in the open · Tagged Content

Lab.

Working notes from the studio. The tools I build, the workflows I keep, the mistakes I paid for.

46 entries · latest 2026-09-09

Browse every entry by topic

Latest entry

RAXXO Studios 9 min read

The One-Line Pitch I Rewrite Last for Every RAXXO Tool

I write every RAXXO tool's one-line pitch only after the build is finished, never before, because a pitch written from intentions is a guess.

BusinessContentWriting
Read the entry
TLDR This entry in one minute
  • I write the one-line pitch for every RAXXO tool last, after the build is finished, never before
  • A pitch has to survive being read alone, out of context, in about three seconds
  • The clearest sign of a weak pitch is a sentence that describes a feature instead of an outcome

All entries · Content